The above sketch is the Highway 75/1st Avenue/Westside Drive design plan in the 4-lane expansion from Murray to Plattsmouth. The sketch was provided by the Nebraska Department of Roads to the City of Plattsmouth. The report is in the Wednesday, January 6th Cassgram.